Lingwu City |
|
|
|
|
40MWp Grid-connected Power Station in Lingwu,Ningxia | |
|
|
|
Location: |
Baitugang Town, Lingwu City,Ningxia |
|
Scale: |
40MWp |
|
Details: |
Polycrystalline solar panels installed with steel bracket in fixed angle |
|
Investor: |
Three Gorges New Energy Angli (Lingwu) Power Generation Co.,Ltd |
|
Contractor: |
Atsun Solar Electric Technology Co.,Ltd |
|
Construction Period: |
Started in Sep 28,2012 |
|
|
| |
|
|
39MWp Grid-connected Power Station in Lingwu,Ningxia | |
|
|
|
Location: |
Baitugang Town, Lingwu City,Ningxia |
|
Scale: |
39MWp |
|
Details: |
Crystalline solar panels installed with steel bracket in fixed angle |
|
Investor: |
Datang Angli (Lingwu) Renewable Power Co.,Ltd |
|
Contractor: |
Atsun Solar Electric Technology Co.,Ltd |
|
Construction Period: |
Started in Sep 28, 2011 and combined to the grid in Dec 28,2011 |
|
|
| |
|
|
10KWp Substation PV DC System in Ningdong,Ningxia | |
|
|
|
Location: |
Ningdong City,Ningxia |
|
Scale: |
10kW |
|
Details: |
Monocrystalline solar panels installed with steel bracket in fixed angle |
|
Investor: |
Ningxia Ningdong Administration of Power Supply |
|
Contractor: |
Atsun Solar Electric Technology Co.,Ltd |
|
Construction Period: |
15 working days |
|
|
| |